SUP
74/25
15MAY25/15MAY26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
74/25
AIRAC
03-APR-25
EFFECTIVE DATE WEF
15-MAY-25
ENR
SUP
74/25
15MAY25/15MAY26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 15 May 2026 (estimated), four wind turbines will be under construction at La Colina Wind Farm, in the municipalities of Alcóntar and Serón (Almería) and Caniles (Granada).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P2-00202_LC-01 | 372423.80N 0023645.40W | 1169 | 188 |
P2-00202_LC-02 | 372424.15N 0023623.15W | 1181 | 188 |
P2-00202_LC-03 | 372426.30N 0023607.03W | 1189 | 188 |
P2-00202_LC-04 | 372431.61N 0023552.32W | 1202 | 188 |
Mobile crane | - | - | 130 |