SUP
77/25
15MAY25/15MAY26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
77/25
AIRAC
03-APR-25
EFFECTIVE DATE WEF
15-MAY-25
ENR
SUP
77/25
15MAY25/15MAY26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 15 May 2026 (estimated), four wind turbines will be under construction at Arce Wind Farm in the municipality of Tíjola (Almería).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0180_AR-01 | 372411.50N 0022942.84W
| 1210 | 188 |
P20-0180_AR-02 | 372402.15N 0022958.40W
| 1205 | 188 |
P20-0180_AR-03 | 372348.57N 0023001.83W
| 1162 | 188 |
P20-0180_AR-04 | 372333.55N 0023001.72W
| 1139 | 188 |
Mobile crane | - | - | 130 |