SUP
78/25
15MAY25/15MAY26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
78/25
AIRAC
03-APR-25
EFFECTIVE DATE WEF
15-MAY-25
ENR
SUP
78/25
15MAY25/15MAY26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 15 May 2026 (estimated), three wind turbines will be under construction in the municipality of Serón (Almería).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0206_LB_01 | 372523.50N 0023516.35W | 1253 | 188 |
P20-0206_LB_02 | 372534.19N 0023453.59W | 1280 | 188 |
P20-0206_LB_03 | 372510.04N 0023527.45W | 1243 | 188 |
Mobile Crane | - | - | 125 |