AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

78/25

AIRAC 

03-APR-25

EFFECTIVE DATE WEF 

15-MAY-25

ENR

SUP 

78/25

15MAY25/15MAY26EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- Los Balazos Wind Farm under construction.

Until 15 May 2026 (estimated), three wind turbines will be under construction in the municipality of Serón (Almería).

For its construction, the installation of a mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P20-0206_LB_01

372523.50N 0023516.35W

1253

188

P20-0206_LB_02

372534.19N 0023453.59W

1280

188

P20-0206_LB_03

372510.04N 0023527.45W

1243

188

Mobile Crane

-

-

125