SUP
80/25
15MAY25/15MAY26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
80/25
AIRAC
03-APR-25
EFFECTIVE DATE WEF
15-MAY-25
ENR
SUP
80/25
15MAY25/15MAY26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 15 May 2026 (estimated), a measurement tower will be under construction at Les Cretes Wind Farm, in the municipality of Batea (Tarragona).
The projected height, elevation and location are detailed in the table below:
ID | COORD | ELEV ( M AMSL) | HGT (M) |
P24-0318
| 410900.81N 0001745.94E | 471 | 123 |