SUP
81/25
15MAY25/15MAY26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
81/25
AIRAC
03-APR-25
EFFECTIVE DATE WEF
15-MAY-25
ENR
SUP
81/25
15MAY25/15MAY26EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 15 May 2026 (estimated), five wind turbines will be under construction at the Parrancanas Wind Farm, in the municipalities of Tíjola and Lúcar (Almería).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below.
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0181_PA-01 | 372419.61N 0022927.98W | 1176 | 188 |
P20-0181_PA-02 | 372431.24N 0022922.66W | 1183 | 188 |
P20-0181_PA-03 | 372349.31N 0022845.93W | 1123 | 188 |
P20-0181_PA-04 | 372526.46N 0022851.97W | 1323 | 188 |
P20-0181_PA-05 | 372442.01N 0022837.83W | 1212 | 188 |
P20-0181 Mobile crane |
|
| 125 |