Until 15 May 2026 (estimated), four wind turbines will be under construction at Vacada V Wind Farm, in the municipality of Fortanete (Teruel).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0058-VA5-01
| 402852.18N 0003456.88W | 1924 | 200 |
P23-0058-VA5-05
| 402740.86N 0003436.13W | 1971 | 200 |
P23-0058-VA5-06
| 402723.95N 0003433.85W | 1971 | 200 |
P23-0058-VA5-07
| 402703.92N 0003403.71W | 1988 | 200 |
Mobile crane |
|
| 140 |