Until 15 May 2026 (estimated), three winds turbine will be under construction at Plasencia Wind Farm, in the municipality of Plasencia (Cáceres).
For its construction, the installation of three tower cranes will be necessary.
The projected height, elevation and location of each element, are detailed in the table below.
ID | COORD | ELEV (M AMSL) | HGT (M) |
P24-0169 AG1 | 395510.5N 0061531.2W | 540 | 165 |
P24-0169 AG2 | 395524.4N 0061517.32W | 571 | 165 |
P24-0169 AG3 | 395542.8N 0061520.9W | 559 | 165 |
P24-0169 Tower crane 1 | 395510.5N 0061531.0W | 494 | 120 |
P24-0169 Tower crane 2 | 395524.4N 0061517.1W | 530 | 120 |
P24-0169 Tower crane 3 | 395542.8N 0061520.6W | 522 | 120 |