SUP
093/26
11JUN26/11JUN27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
093/26
AIRAC 30-APR-26
EFFECTIVE DATE WEF 11-JUN-26
ENR
CANCEL:
SUP
093/26
11JUN26/11JUN27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 11 June 2027 (estimated), three wind turbines will be under construction at the Virgen de las Angustias Wind Farm, in the municipality of Albuñuelas (Granada).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
|---|---|---|---|
P23-0380 AEG-01 | 365754.31N 0033824.18W | 1159 | 180 |
P23-0380 AEG-02 | 365735.37N 0033830.13W | 1193 | 180 |
P23-0380 AEG-03 | 365705.08N 0033824.75W | 1210 | 180 |
P24-0461 Mobile crane | - | - | 130 |