SUP
101/26
09JUL26/09JUL27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
101/26
AIRAC 28-MAY-26
EFFECTIVE DATE WEF 09-JUL-26
ENR
CANCEL:
SUP
101/26
09JUL26/09JUL27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 09 July 2027 (estimated), four wind turbines will be under construction at Repotenciación Montes de Cierzo I Wind Farm in the municipality of Tudela (Navarra).
For its construction, the installation of four mobile cranes will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0379 MC_I-01 | 420517.86N 0014209.01W | 608 | 200 |
P23-0379 MC_I-02 | 420520.55N 0014154.24W | 605 | 200 |
P23-0379 MC_I-03 | 420527.09N 0014142.35W | 602 | 200 |
P23-0379 MC_I-05 | 420549.75N 0014031.71W | 549 | 150 |
P23-0379 Mobile crane 1 | - | - | 125 |
P23-0379 Mobile crane 2 | - | - | 125 |
P23-0379 Mobile crane 3 | - | - | 125 |
P23-0379 Mobile crane 5 | - | - | 125 |