SUP
102/26
09JUL26/09JUL27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
102/26
AIRAC 28-MAY-26
EFFECTIVE DATE WEF 09-JUL-26
ENR
CANCEL:
SUP
102/26
09JUL26/09JUL27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 09 July 2027 (estimated), fifteen wind turbines and a measurement tower will be under construction at Santa María de las Fuentes Wind Farm in the municipality of Astudillo, (Palencia).
For its construction, the installation of two mobile cranes will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P21-0035 SM01 | 421041.24N 0041927.83W | 1085 | 200 |
P21-0035 SM02 | 421103.72N 0042025.10W | 1087 | 200 |
P21-0035 SM03 | 421052.31N 0042016.84W | 1085 | 200 |
P21-0035 SM04 | 421039.20N 0042015.08W | 1070 | 200 |
P21-0035 SM05 | 421025.84N 0042020.42W | 1083 | 200 |
P21-0035 SM06 | 421012.23N 0042023.10W | 1083 | 200 |
P21-0035 SM07 | 421102.06N 0042053.71W | 1082 | 200 |
P21-0035 SM09 | 421006.16N 0042205.09W | 1084 | 200 |
P21-0035 SM10 | 420949.15N 0042204.07W | 1084 | 200 |
P21-0035 SM11 | 420934.89N 0042157.66W | 1082 | 200 |
P21-0035 SM12 | 420921.48N 0042154.10W | 1078 | 200 |
P21-0035 SM13 | 420947.82N 0041935.21W | 1074 | 200 |
P21-0035 SM14 | 420944.25N 0041912.70W | 1084 | 200 |
P21-0035 SM15 | 420931.19N 0041904.06W | 1086 | 200 |
P21-0035 SM16 | 420901.75N 0041915.08W | 1086 | 200 |
P21-0035 TM | 420916.84N 0041908.64W | 993 | 105 |
G25-0510 Mobile crane 1 | - | - | 145 |
G25-0510 Mobile crane 2 | - | - | 145 |