SUP 

112/26

AIRAC 28-MAY-26

EFFECTIVE DATE WEF 09-JUL-26

AD

CANCEL: SUP 71/25

SUP 

112/26

09JUL26/09JUL27EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

BARCELONA/Josep Tarradellas-El Prat AD (LEBL).- Reconfiguration of Ramp 0 and upgrading of the lighting on Ramps 0 and 1.

Until 09 July 2027 (estimated), works will be under way in the airfield at BARCELONA/Josep Tarradellas Barcelona – El Prat Airport to reconfigure the aircraft parking stand positions and the apron lighting towers on Ramp 0 and Ramp 1.

WORK STAGES AND AVAILABILITY OF PARKING STANDS

The works will be carried out in several phases.

The start and end dates of the phases, as well as any operational incidents, will be published via the relevant NOTAM.

During the works, the aircraft parking stands will be modified, with the existing parking stands being replaced by new ones in a different location.

• Annex 1 sets out the anticipated operational impacts during the various phases of the works.

• Annex 2 contains the plans for the remodelling works on Ramp 0.

• Annex 3 contains a table summarising the availability of parking stands for each phase.

• Annex 4 lists the coordinates of the existing parking stands and the new stands that are being commissioned.

GENERAL RULES DURING THE EXECUTION OF THE WORKS

The following requirements must be taken into account during the execution of the works:

• The works shall be clearly marked with both night-time and daytime lighting.

• Taxiing routes must comply with ATC and/or SDP instructions.

• Caution is recommended due to the presence of staff and machinery.

• Aircraft shall taxi at minimum power during diversions to avoid jet efflux in areas where staff are working.

• Aircraft access to parking stands will be directed by the airports marshalling service (Runway and Apron Service).

• Aircraft exiting the new parking stands will be supervised by the Runway and Apron Service whilst the works are in progress.

• Operators must ensure, through the ground handling agent, that pushback or pull-forward equipment is available to move the aircraft from its parking stand.

• Work on TWY U1, U2 and U3 will preferably be carried out during the day, with occasional closures of the TWY with a 30-minute PPR.

ANNEX 1: OPERATIONAL IMPACTS

The operational impacts of the various phases are set out below, covering both the reconfiguration work on Ramp 0 and the compliance work on the lighting towers at Ramps 0 and 1.

OPERATIONAL IMPACTS

PHASES

RAMP 0 RECONFIGURATION

LIGHTING COMPLIANCE AT RAMPS 0 AND 1

1

U/S PRKG 48A, 49, 38, 26, 15 and 04.

U/S temporarily during the execution of the phase of position 57.

Occasional restrictions on TWY U2 for code letter E aircraft with a 30-minute PPR.

2A

U/S PRKG 01, 02, 03, 11, 12, 13, 14, 22, 23, 24, 25, 35, 36 and 37.

Temporary U/S of PRKG 21 during this phase.

Daytime closures of TWY U2, U3L and GATE AN with 30‑minute PPR.

At the end of the phase:

GATE AN renamed to GATE IB.

New GATE AN.

New TWY B1.

New PRKG 11, 12, 13, 14 and 15 (PRKG 11 unavailable until phase 2B opens).

PRKG 12 usable with eastward pushback and pull‑forward to PRKG 13 access marking during phase 2B.

No impact.

2B

U/S PRKG 55, 56, 57, 46, 46A, 47 and 48.

Access routes to stands in the 10s, 20s, 30s and 40s will be adapted progressively as works advance.

Initially the existing route will be used until the new one becomes available.

At the end of the phase:

New PRKG 10, 54 and 55 (PRKG 54 unavailable until phase 3; PRKG 55 requires pushback and pull‑forward via TWY B1) at the end of 2B phase.

No impact.

3

U/S PRKG 54, 40, 41, 42, 43, 44, 44A and 45.

Access to PRKG 51, 52 and 53 will be via the western side, with departures requiring towed pushback operations.

Departures from PRKG 31, 32, 33 and 34 will require towed pushback facing south for stand exit.

At the end of the phase:

New TWY B2 becomes operational.

New PRKG 54 will be commissioned at the end of this phase.

Occasional restrictions on TWY U2 for Code E aircraft with 30‑minute PPR.

4A

U/S PRKG 31, 32, 33, 34 and 21.

At the end of the phase:

New PRKG 20, 21, 22, 23, 24, 25, 30, 31, 32, 33, 34 and 35 will enter into service.

PRKG 30 to 34 shall operate with pushback until the completion of Phase 4B; thereafter they will revert to autonomous (self‑maneuvering) operations.

No impact.

4B

H24 closure of GATE BN.

Daytime closures of U1 and U2 with 30‑minute PPR.

At the end of the phase:

New PRKG 40, 41 and 42 will enter into service.

H24 closure of GATE BN.

5

U/S PRKG 51, 52, 53, 61, 62 and 63.

The centreline marking works on the taxiway segment between the 60‑series and 70‑series stands will require temporary taxiway closure with 30‑minute PPR.

Occasional restrictions will apply to arrivals and departures at PRKG 71, 72 and 83–87.

At the end of the phase:

New PRKG 51, 52, 53, 60, 61, 62, 63, 64, 66, 67 and 68 will enter into service.

New TWY B3 will become operational.

No impact.

6

N/A

Temporary U/S PRKG ands 95, 96, 85, 86 and 87.

Temporary U/S PRKG 94.

Temporary U/S stands 84 and 83A..

7

N/A

Temporary U/S PRKG 94.

Temporary U/S stands 81 and 81A.

8

N/A

Temporary U/S PRKG 84 and 83A.

Temporary U/S stands 81 and 81A.

9

N/A

Temporary U/S PRKG 81 and 81A.

10

N/A

GATE CN limited to Code C aircraft during working hours with 15‑minute PPR.

ANNEX 2: PHASE DRAWINGS FOR RAMP 0 RECONFIGURATION WORKS

Stands shown in red: Stands taken out of service during the execution of the corresponding construction phase.

Stands shown in green: New stands that enter into service during the corresponding construction phase.

Stands shown in orange: Existing stands whose access direction is modified during the corresponding construction phase.

Stands shown in black: Pre‑existing stands that remain in service from previous phases (no changes).

PHASE 1

PHASE 2A

PHASE 2B

PHASE 3

PHASE 4A

PHASE 4B

PHASE 5

FINAL SITUATION

ANNEX 3: STAND AVAILABILITY BY CONSTRUCTION PHASE

The table indicates the stand availability changes for each construction phase.

INICIAL

PHASE 1

PHASE 2

PHASE 2B

PHASE 3

PHASE 4A

PHASE 4B

PHASE 5

NEW

01

02

03

04

 

10

11

11

12

12

13

13

14

14

15

15

20

20

21

21

22

22

23

23

24

24

25

25

26

30

30

31

31

32

32

33

33

34

34

35

35

36

37

38

40

40

41

41

42

42

43

44

44A

45

46

46A

47

48

48A

49

50

51

 

51

52

 

52

53

 

53

54

54

55

55

56

57

60

61

61

62

62

63

63

64

64

66

66

67

67

68

68

Stand in service at the start of the works

Unserviced or non-existent stand

New stand in service

 

ANNEX 4: COORDINATES OF THE STANDS

INITIALLY EXISTING STAND COORDINATES

PRKG

RAMP

COORD

01

R0

411830.60N 0020527.34E

02

R0

411831.19N 0020526.98E

03

R0

411831.78N 0020526.63E

04

R0

411832.37N 0020526.28E

11

R0

411829.17N 0020524.71E

12

R0

411829.73N 0020524.37E

13

R0

411830.29N 0020524.03E

14

R0

411830.85N 0020523.70E

15

R0

411831.41N 0020523.35E

21

R0

411828.15N 0020524.31E

22

R0

411828.75N 0020523.95E

23

R0

411829.34N 0020523.60E

24

R0

411829.93N 0020523.24E

25

R0

411830.52N 0020522.89E

26

R0

411831.11N 0020522.54E

31

R0

411825.38N 0020522.70E

32

R0

411826.06N 0020522.30E

33

R0

411826.74N 0020521.90E

34

R0

411827.42N 0020521.48E

35

R0

411828.10N 0020521.07E

36

R0

411828.77N 0020520.66E

37

R0

411829.45N 0020520.25E

38

R0

411830.13N 0020519.84E

40

R0

411823.90N 0020522.52E

41

R0

411824.45N 0020522.17E

42

R0

411825.06N 0020521.75E

43

R0

411825.74N 0020521.35E

44

R0

411826.42N 0020520.94E

44A

R0

411826.76N 0020520.76E

45

R0

411827.09N 0020520.53E

46

R0

411827.77N 0020520.12E

46A

R0

411828.12N 0020519.94E

47

R0

411828.45N 0020519.71E

48

R0

411829.13N 0020519.30E

48A

R0

411829.48N 0020519.12E

49

R0

411829.81N 0020518.90E

51

R0

411823.04N 0020518.20E

52

R0

411824.06N 0020517.58E

53

R0

411824.96N 0020516.93E

54

R0

411826.11N 0020517.34E

55

R0

411826.64N 0020515.92E

56

R0

411827.48N 0020515.41E

57

R0

411828.32N 0020514.91E

61

R1

411822.33N 0020514.06E

62

R1

411823.31N 0020513.47E

63

R1

411824.30N 0020512.87E

 

NEW STAND COORDINATES

PRKG

RAMP

COORD

10

R0

411828.24N 0020520.78E

11

R0

411828.70N 0020522.18E

12

R0

411829.20N 0020523.61E

13

R0

411829.69N 0020525.04E

14

R0

411830.18N 0020526.47E

15

R0

411830.96N 0020527.51E

20

R0

411827.39N 0020520.51E

21

R0

411827.71N 0020521.46E

22

R0

411828.04N 0020522.42E

23

R0

411828.37N 0020523.37E

24

R0

411828.70N 0020524.33E

25

R0

411829.02N 0020525.28E

30

R0

411825.53N 0020521.52E

31

R0

411825.79N 0020522.31E

32

R0

411826.06N 0020523.09E

33

R0

411826.33N 0020523.87E

34

R0

411826.60N 0020524.66E

35

R0

411826.87N 0020525.44E

40

R0

411824.02N 0020522.44E

41

R0

411824.29N 0020523.22E

42

R0

411824.56N 0020524.01E

50

R0

411823.07N 0020518.34E

51

R0

411824.09N 0020517.86E

52

R0

411825.07N 0020517.27E

53

R0

411826.05N 0020516.68E

54

R0

411826.99N 0020515.62E

55

R0

4118'28.16N 0020515.04E

60

R1

411821.96N 0020515.75E

61

R1

411822.49N 0020516.40E

62

R1

411822.68N 0020515.31E

64

R1

411823.41N 0020514.88E

65

R1

411823.69N 0020515.68E

66

R1

411824.15N 0020514.44E

67

R1

411824.88N 0020514.96E

68

R1

411824.87N 0020514.00E