SUP
112/26
09JUL26/09JUL27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
AIS-ESPAÑA
Dirección AFTN: LEANZXTA
Teléfono: +34 913 213 363
E-mail: ais@enaire.es
Web: www.enaire.es
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
112/26
AIRAC 28-MAY-26
EFFECTIVE DATE WEF 09-JUL-26
AD
CANCEL: SUP 71/25
SUP
112/26
09JUL26/09JUL27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 09 July 2027 (estimated), works will be under way in the airfield at BARCELONA/Josep Tarradellas Barcelona – El Prat Airport to reconfigure the aircraft parking stand positions and the apron lighting towers on Ramp 0 and Ramp 1.
WORK STAGES AND AVAILABILITY OF PARKING STANDS
The works will be carried out in several phases.
The start and end dates of the phases, as well as any operational incidents, will be published via the relevant NOTAM.
During the works, the aircraft parking stands will be modified, with the existing parking stands being replaced by new ones in a different location.
• Annex 1 sets out the anticipated operational impacts during the various phases of the works.
• Annex 2 contains the plans for the remodelling works on Ramp 0.
• Annex 3 contains a table summarising the availability of parking stands for each phase.
• Annex 4 lists the coordinates of the existing parking stands and the new stands that are being commissioned.
GENERAL RULES DURING THE EXECUTION OF THE WORKS
The following requirements must be taken into account during the execution of the works:
• The works shall be clearly marked with both night-time and daytime lighting.
• Taxiing routes must comply with ATC and/or SDP instructions.
• Caution is recommended due to the presence of staff and machinery.
• Aircraft shall taxi at minimum power during diversions to avoid jet efflux in areas where staff are working.
• Aircraft access to parking stands will be directed by the airports marshalling service (Runway and Apron Service).
• Aircraft exiting the new parking stands will be supervised by the Runway and Apron Service whilst the works are in progress.
• Operators must ensure, through the ground handling agent, that pushback or pull-forward equipment is available to move the aircraft from its parking stand.
• Work on TWY U1, U2 and U3 will preferably be carried out during the day, with occasional closures of the TWY with a 30-minute PPR.
The operational impacts of the various phases are set out below, covering both the reconfiguration work on Ramp 0 and the compliance work on the lighting towers at Ramps 0 and 1.
OPERATIONAL IMPACTS |
||
|---|---|---|
PHASES |
RAMP 0 RECONFIGURATION |
LIGHTING COMPLIANCE AT RAMPS 0 AND 1 |
1 |
U/S PRKG 48A, 49, 38, 26, 15 and 04. U/S temporarily during the execution of the phase of position 57. |
Occasional restrictions on TWY U2 for code letter E aircraft with a 30-minute PPR. |
2A |
U/S PRKG 01, 02, 03, 11, 12, 13, 14, 22, 23, 24, 25, 35, 36 and 37. Temporary U/S of PRKG 21 during this phase. Daytime closures of TWY U2, U3L and GATE AN with 30‑minute PPR. At the end of the phase: GATE AN renamed to GATE IB. New GATE AN. New TWY B1. New PRKG 11, 12, 13, 14 and 15 (PRKG 11 unavailable until phase 2B opens). PRKG 12 usable with eastward pushback and pull‑forward to PRKG 13 access marking during phase 2B. |
No impact. |
2B |
U/S PRKG 55, 56, 57, 46, 46A, 47 and 48. Access routes to stands in the 10s, 20s, 30s and 40s will be adapted progressively as works advance. Initially the existing route will be used until the new one becomes available. At the end of the phase: New PRKG 10, 54 and 55 (PRKG 54 unavailable until phase 3; PRKG 55 requires pushback and pull‑forward via TWY B1) at the end of 2B phase. |
No impact. |
3 |
U/S PRKG 54, 40, 41, 42, 43, 44, 44A and 45. Access to PRKG 51, 52 and 53 will be via the western side, with departures requiring towed pushback operations. Departures from PRKG 31, 32, 33 and 34 will require towed pushback facing south for stand exit. At the end of the phase: New TWY B2 becomes operational. New PRKG 54 will be commissioned at the end of this phase. |
Occasional restrictions on TWY U2 for Code E aircraft with 30‑minute PPR. |
4A |
U/S PRKG 31, 32, 33, 34 and 21. At the end of the phase: New PRKG 20, 21, 22, 23, 24, 25, 30, 31, 32, 33, 34 and 35 will enter into service. PRKG 30 to 34 shall operate with pushback until the completion of Phase 4B; thereafter they will revert to autonomous (self‑maneuvering) operations. |
No impact. |
4B |
H24 closure of GATE BN. Daytime closures of U1 and U2 with 30‑minute PPR. At the end of the phase: New PRKG 40, 41 and 42 will enter into service. |
H24 closure of GATE BN. |
5 |
U/S PRKG 51, 52, 53, 61, 62 and 63. The centreline marking works on the taxiway segment between the 60‑series and 70‑series stands will require temporary taxiway closure with 30‑minute PPR. Occasional restrictions will apply to arrivals and departures at PRKG 71, 72 and 83–87. At the end of the phase: New PRKG 51, 52, 53, 60, 61, 62, 63, 64, 66, 67 and 68 will enter into service. New TWY B3 will become operational. |
No impact. |
6 |
N/A |
Temporary U/S PRKG ands 95, 96, 85, 86 and 87. Temporary U/S PRKG 94. Temporary U/S stands 84 and 83A.. |
7 |
N/A |
Temporary U/S PRKG 94. Temporary U/S stands 81 and 81A. |
8 |
N/A |
Temporary U/S PRKG 84 and 83A. Temporary U/S stands 81 and 81A. |
9 |
N/A |
Temporary U/S PRKG 81 and 81A. |
10 |
N/A |
GATE CN limited to Code C aircraft during working hours with 15‑minute PPR. |
ANNEX 2: PHASE DRAWINGS FOR RAMP 0 RECONFIGURATION WORKS
Stands shown in red: Stands taken out of service during the execution of the corresponding construction phase.
Stands shown in green: New stands that enter into service during the corresponding construction phase.
Stands shown in orange: Existing stands whose access direction is modified during the corresponding construction phase.
Stands shown in black: Pre‑existing stands that remain in service from previous phases (no changes).
PHASE 1
PHASE 2A
PHASE 2B
PHASE 3
PHASE 4A
PHASE 4B
PHASE 5
FINAL SITUATION
ANNEX 3: STAND AVAILABILITY BY CONSTRUCTION PHASE
The table indicates the stand availability changes for each construction phase.
INICIAL |
PHASE 1 |
PHASE 2 |
PHASE 2B |
PHASE 3 |
PHASE 4A |
PHASE 4B |
PHASE 5 |
NEW |
|---|---|---|---|---|---|---|---|---|
01 |
||||||||
02 |
||||||||
03 |
||||||||
04 |
||||||||
|
10 |
|||||||
11 |
11 |
|||||||
12 |
12 |
|||||||
13 |
13 |
|||||||
14 |
14 |
|||||||
15 |
15 |
|||||||
20 |
20 |
|||||||
21 |
21 |
|||||||
22 |
22 |
|||||||
23 |
23 |
|||||||
24 |
24 |
|||||||
25 |
25 |
|||||||
26 |
||||||||
30 |
30 |
|||||||
31 |
31 |
|||||||
32 |
32 |
|||||||
33 |
33 |
|||||||
34 |
34 |
|||||||
35 |
35 |
|||||||
36 |
||||||||
37 |
||||||||
38 |
||||||||
40 |
40 |
|||||||
41 |
41 |
|||||||
42 |
42 |
|||||||
43 |
||||||||
44 |
||||||||
44A |
||||||||
45 |
||||||||
46 |
||||||||
46A |
||||||||
47 |
||||||||
48 |
||||||||
48A |
||||||||
49 |
||||||||
50 |
||||||||
51 |
|
51 |
||||||
52 |
|
52 |
||||||
53 |
|
53 |
||||||
54 |
54 |
|||||||
55 |
55 |
|||||||
56 |
||||||||
57 |
||||||||
60 |
||||||||
61 |
61 |
|||||||
62 |
62 |
|||||||
63 |
63 |
|||||||
64 |
64 |
|||||||
66 |
66 |
|||||||
67 |
67 |
|||||||
68 |
68 |
|||||||
Stand in service at the start of the works |
||||||||
Unserviced or non-existent stand |
||||||||
New stand in service |
||||||||
INITIALLY EXISTING STAND COORDINATES |
||
|---|---|---|
PRKG |
RAMP |
COORD |
01 |
R0 |
411830.60N 0020527.34E |
02 |
R0 |
411831.19N 0020526.98E |
03 |
R0 |
411831.78N 0020526.63E |
04 |
R0 |
411832.37N 0020526.28E |
11 |
R0 |
411829.17N 0020524.71E |
12 |
R0 |
411829.73N 0020524.37E |
13 |
R0 |
411830.29N 0020524.03E |
14 |
R0 |
411830.85N 0020523.70E |
15 |
R0 |
411831.41N 0020523.35E |
21 |
R0 |
411828.15N 0020524.31E |
22 |
R0 |
411828.75N 0020523.95E |
23 |
R0 |
411829.34N 0020523.60E |
24 |
R0 |
411829.93N 0020523.24E |
25 |
R0 |
411830.52N 0020522.89E |
26 |
R0 |
411831.11N 0020522.54E |
31 |
R0 |
411825.38N 0020522.70E |
32 |
R0 |
411826.06N 0020522.30E |
33 |
R0 |
411826.74N 0020521.90E |
34 |
R0 |
411827.42N 0020521.48E |
35 |
R0 |
411828.10N 0020521.07E |
36 |
R0 |
411828.77N 0020520.66E |
37 |
R0 |
411829.45N 0020520.25E |
38 |
R0 |
411830.13N 0020519.84E |
40 |
R0 |
411823.90N 0020522.52E |
41 |
R0 |
411824.45N 0020522.17E |
42 |
R0 |
411825.06N 0020521.75E |
43 |
R0 |
411825.74N 0020521.35E |
44 |
R0 |
411826.42N 0020520.94E |
44A |
R0 |
411826.76N 0020520.76E |
45 |
R0 |
411827.09N 0020520.53E |
46 |
R0 |
411827.77N 0020520.12E |
46A |
R0 |
411828.12N 0020519.94E |
47 |
R0 |
411828.45N 0020519.71E |
48 |
R0 |
411829.13N 0020519.30E |
48A |
R0 |
411829.48N 0020519.12E |
49 |
R0 |
411829.81N 0020518.90E |
51 |
R0 |
411823.04N 0020518.20E |
52 |
R0 |
411824.06N 0020517.58E |
53 |
R0 |
411824.96N 0020516.93E |
54 |
R0 |
411826.11N 0020517.34E |
55 |
R0 |
411826.64N 0020515.92E |
56 |
R0 |
411827.48N 0020515.41E |
57 |
R0 |
411828.32N 0020514.91E |
61 |
R1 |
411822.33N 0020514.06E |
62 |
R1 |
411823.31N 0020513.47E |
63 |
R1 |
411824.30N 0020512.87E |
NEW STAND COORDINATES |
||
|---|---|---|
PRKG |
RAMP |
COORD |
10 |
R0 |
411828.24N 0020520.78E |
11 |
R0 |
411828.70N 0020522.18E |
12 |
R0 |
411829.20N 0020523.61E |
13 |
R0 |
411829.69N 0020525.04E |
14 |
R0 |
411830.18N 0020526.47E |
15 |
R0 |
411830.96N 0020527.51E |
20 |
R0 |
411827.39N 0020520.51E |
21 |
R0 |
411827.71N 0020521.46E |
22 |
R0 |
411828.04N 0020522.42E |
23 |
R0 |
411828.37N 0020523.37E |
24 |
R0 |
411828.70N 0020524.33E |
25 |
R0 |
411829.02N 0020525.28E |
30 |
R0 |
411825.53N 0020521.52E |
31 |
R0 |
411825.79N 0020522.31E |
32 |
R0 |
411826.06N 0020523.09E |
33 |
R0 |
411826.33N 0020523.87E |
34 |
R0 |
411826.60N 0020524.66E |
35 |
R0 |
411826.87N 0020525.44E |
40 |
R0 |
411824.02N 0020522.44E |
41 |
R0 |
411824.29N 0020523.22E |
42 |
R0 |
411824.56N 0020524.01E |
50 |
R0 |
411823.07N 0020518.34E |
51 |
R0 |
411824.09N 0020517.86E |
52 |
R0 |
411825.07N 0020517.27E |
53 |
R0 |
411826.05N 0020516.68E |
54 |
R0 |
411826.99N 0020515.62E |
55 |
R0 |
4118'28.16N 0020515.04E |
60 |
R1 |
411821.96N 0020515.75E |
61 |
R1 |
411822.49N 0020516.40E |
62 |
R1 |
411822.68N 0020515.31E |
64 |
R1 |
411823.41N 0020514.88E |
65 |
R1 |
411823.69N 0020515.68E |
66 |
R1 |
411824.15N 0020514.44E |
67 |
R1 |
411824.88N 0020514.96E |
68 |
R1 |
411824.87N 0020514.00E |