SUP
116/26
06AUG26/06AUG27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
116/26
AIRAC 25-JUN-26
EFFECTIVE DATE WEF 06-AUG-26
ENR
CANCEL:
SUP
116/26
06AUG26/06AUG27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 06 August 2027 (estimated), six wind turbines will be under construction at Caparroso Wind Farm in the municipality of Caparroso (Navarra).
For their construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
CAP1 Windmill | 421830.40N 0013829.08W | 611 | 198 |
CAP2 Windmill | 421807.19N 0013829.58W | 609 | 198 |
CAP3 Windmill | 421818.56N 0013801.82W | 619 | 198 |
CAP4 Windmill | 421804.97N 0013736.26W | 617 | 198 |
CAP5 Windmill | 421726.68N 0013704.17W | 627 | 198 |
CAP6 Windmill | 421736.75N 0013639.19W | 612 | 198 |
Measurement tower | 421811.26N 0013844.74W | 528 | 116 |
Mobile crane | - | - | 150 |