AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

127/26

AIRAC 25-JUN-26

EFFECTIVE DATE WEF 06-AUG-26

ENR

CANCEL:

SUP 

127/26

06AUG26/06AUG27EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR MADRID.- Repotenciacion Serralta and San Gregorio Wind Farms under construction.

Until 06 August 2027 (estimated), five wind turbines and a measurement tower will be under construction at Repotenciacion Serralta and San Gregorio Wind Farms in the municipality of Cabanillas (Navarra).

For its construction, the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:.

ID

COORD

ELEV (M AMSL)

HGT (M)

SER_01

420436.04N 0013213.59W

580

201

SER_02

420424.74N 0013225.30W

568

201

GRG_01

420410.86N 0013248.24W

568

198

GRG_02

420407.76N 0013311.64W

564

198

GRG_03

420357.83N 0013323.91W

553

198

Measurement Tower

420347.71N 0013328.67W

444

116

Mobile crane

-

580

201