SUP
183/26
29OCT26/29OCT27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
183/26
AIRAC 17-SEP-26
EFFECTIVE DATE WEF 29-OCT-26
AD
CANCEL:
SUP
183/26
29OCT26/29OCT27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 29 October 2027 (estimated), works to reconfigure the apron and taxiway area will be carried out.
The works will take place in fourteen phases, the areas affected in each one of them are those specified in the present document.
The phases might not necessarily be executed in the order defined, and several phases might be activated and deactivated simultaneously.
The start and end dates of each phase, as well as any operational incident, will be announced by the corresponding NOTAM.
All phases of the works shall be duly marked and lit.
Caution is recommended due to the presence of personnel and machinery.
The works will be performed at daytime or at night time. If any action affects any airport service or operations, the day and time slot will be coordinated in order to execute the works.
PHASES
PHASE 1. CLOUSURE OF TAXIWAY SECTION V1-V2 BETWEEN PRKG 30 AND PRKG 32
Operational restrictions: taxiway section V1-V2 between PRKG 30 and PRKG 32 closed.
PHASE 2. CLOSURE OF PRKG 34B
Operational restrictions: PRKG 34B closed.
PHASE 3. CLOSURE OF PRKG 36
Operational restrictions: PRKG 36 closed.
PHASE 4. CLOUSURE OF TAXIWAY SECTION V1-V2 BETWEEN PRKG 34 AND PRKG 38
Operational restrictions: taxiway section V1-V2 between PRKG 34 and PRKG 38 closed.
PHASE 5. CLOSURE OF PRKG 38
Operational restrictions: PRKG 38 closed.
PHASE 6. CLOSURE OF PRKG 40
Operational restrictions: PRKG 40 closed.
PHASE 7. CLOSURE OF PRKG 42
Operational restrictions: PRKG 42 closed.
PHASE 8. CLOSURE OF PRKG 20
Operational restrictions: PRKG 20 closed.
PHASE 9. CLOSURE OF PRKG 109
Operational restrictions: PRKG 109 closed.
PHASE 10. CLOSURE OF PRKG 114-114B
Operational restrictions: PRKG 114-114B closed.
PHASE 11. CLOSURE OF PRKG 115
Operational restrictions: PRKG 115 closed.
PHASE 12. CLOSURE OF PRKG 116
Operational restrictions: PRKG 116 closed.
PHASE 13. CLOUSURE OF TAXIWAY SECTION LF BETWEEN PRKG 23B AND PRKG 115
Operational restrictions: taxiway section LF between PRKG 23B and PRKG 115 closed.
PHASE 14. CLOUSURE OF TAXIWAY SECTION LF BETWEEN PRKG 114 AND PEI LE ABREAST PRKG 109
Operational restrictions: taxiway section LF between PRKG 114 and PEI LE abreast PRKG 109 closed.