SUP
059/26
16APR26/16APR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
059/26
16-APR-26
EFFECTIVE DATE WEF
ENR
CANCEL: SUP 67/25
SUP
059/26
16APR26/16APR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 16 April 2027 (estimated), six wind turbines will be under construction at La Vacada II Wind Farm, in the municipality of Mosqueruela (Teruel).
The projected height, elevation and location of each element are detailed in the table below:
ID | COOR | ELEV (M AMSL) | HGT (M) |
P23-0057-VA2-01 Windmill | 402453.98N 0002521.55W | 1783 | 200 |
P23-0057-VA2-02 Windmill | 402441.73N 0002536.39W | 1782 | 200 |
P23-0057-VA2-03 Windmill | 402431.95N 0002554.63W | 1783 | 200 |
P23-0057-VA2-04 Windmill | 402423.77N 0002614.49W | 1787 | 200 |
P23-0057-VA2-05 Windmill | 402401.64N 0002620.41W | 1796 | 200 |
P23-0057-VA2-07 Windmill | 402327.95N 0002636.12W | 1852 | 200 |