SUP
061/26
16APR26/16APR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
061/26
16-APR-26
EFFECTIVE DATE WEF
ENR
CANCEL: SUP 65/25
SUP
061/26
16APR26/16APR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 16 April 2027 (estimated), four wind turbines will be under construction at La Vacada III Wind Farm, in the municipality of Mosqueruela (Teruel).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each one of these elements, are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0316-VA3-01 Windmill | 402319.85N 0002721.93W | 1872 | 200 |
P20-0316-VA3-02 Windmill | 402303.23N 0002726.88W | 1853 | 200 |
P20-0316-VA3-04 Windmill | 402230.58N 0002756.69W | 1901 | 200 |
P20-0316-VA3-07 Windmill | 402142.09N 0002835.48W | 1892 | 200 |
Mobile Crane | - | - | 140 |