Until 16 April 2027 (estimated), six wind turbines will be under construction at El Cabecero IV Wind Farm in the municipality of Fortanete (Teruel).
For its construction, the installation of a mobile crane will be necessary which will move to the location of each wind turbine to proceed with its lifting.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0041-CB4-01 Windmill | 402832.15N 0003412.58W | 1939 | 200 |
P23-0041-CB4-03 Windmill | 402938.55N 0003439.79W | 1890 | 200 |
P23-0041-CB4-04 Windmill | 402924.71N 0003451.20W | 1898 | 200 |
P23-0041-CB4-05 Windmill | 402908.99N 0003500.48W | 1918 | 200 |
P23-0041-CB4-06 Windmill | 402932.88N 0003309.18W | 1884 | 200 |
P23-0041-CB4-07 Windmill | 402919.12N 0003325.61W | 1919 | 200 |
P23-0041-CB4-GM Mobile crane | - | - | 200 |