AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

067/26

16-APR-26

EFFECTIVE DATE WEF

ENR

CANCEL: SUP 38/25

SUP 

067/26

16APR26/16APR27EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR BARCELONA.- Concejo I Wind Farm under construction.

Until 16 April 2027 (estimated), five wind turbines and a measurement tower will be under construction in the municipality of La Iglesuela del Cid (Teruel).

For its construction the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P23-0047-CJ1-01 WINDMILL

402954.83N 0001948.56W

1599

200

P23-0047-CJ1-05 WINDMILL

402958.59N 0001754.17W

1501

200

P23-0047-CJ1-06 WINDMILL

403009.10N 0001738.81W

1506

200

P23-0047-CJ1-07 WINDMILL

403002.79N 0001706.31W

1476

200

P23-0047-CJ1-08 WINDMILL

402937.60N 0001753.76W

1489

200

P23-0047-CJ1-TM

403018.345N 0001723.10W

1415

120