AIS-ESPAÑA

Dirección AFTN: LEANZXTA

Teléfono: +34 913 213 363

E-mail: ais@enaire.es

Web: www.enaire.es

ESPAÑA

ENAIRE

DIVISIÓN DE INFORMACIÓN AERONÁUTICA

c/ Campezo, 1. EDIFICIO 2

Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)

AIP-ESPAÑA

SUP 

070/26

16-APR-26

EFFECTIVE DATE WEF

ENR

CANCEL: SUP 52/25

SUP 

070/26

16APR26/16APR27EST

NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.

FIR BARCELONA.- Concejo III Wind Farm under construction.

Until 16 April 2027 (estimated), seven wind turbines and a meteorological tower will be under construction at the Concejo III Wind Farm, in the municipality of Cantavieja (Teruel).

For their construction, the installation of one mobile crane will be necessary.

The projected height, elevation and location of each element are detailed in the table below:

ID

COORD

ELEV (M AMSL)

HGT (M)

P23-0042-CJ3-01 Windmill

402809.36N 0002320.71W

1855

200

P23-0042-CJ3-02 Windmill

402830.41N 0002312.29W

1842

200

P23-0042-CJ3-03 Windmill

402850.53N 0002301.49W

1834

200

P23-0042-CJ3-04 Windmill

402904.83N 0002247.26W

1822

200

P23-0042-CJ3-06 Windmill

402917.34N 0002333.83W

1828

200

P23-0042-CJ3-07 Windmill

402914.39N 0002358.32W

1842

200

P23-0042-CJ3-08 Windmill

402859.79N 0002412.56W

1856

200

P23-0042-CJ3-TMA Meteorological tower

402936.24N 0002337.90W

1755

120

P23-0042-CJ3-01 Mobile crane

-

-

140