EFFECTIVE DATE WEF
ENR
CANCEL: SUP 57/25
SUP
073/26
16APR26/16APR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 16 April 2027 (estimated), seven wind turbines will be under construction at “El Cabecero II” Wind Farm, in the municipality of Fortanete (Teruel).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P20-0295-CB2-01 | 402651.46N 0003118.74W | 1918 | 200 |
P20-0295-CB2-02 | 402644.34N 0003140.61W | 1978 | 200 |
P20-0295-CB2-03 | 402639.01N 0003205.51W | 2041 | 200 |
P20-0295-CB2-04 | 402630.86N 0003223.38W | 2016 | 200 |
P20-0295-CB2-05 | 402608.01N 0003214.62W | 2043 | 200 |
P20-0295-CB2-06 | 402600.78N 0003231.69W | 2051 | 200 |
P20-0295-CB2-07 | 402545.11N 0003239.89W | 2036 | 200 |
Mobile crane |
|
| 140 |