SUP
076/26
16APR26/16APR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
076/26
16-APR-26
EFFECTIVE DATE WEF
ENR
CANCEL: SUP 53/25
SUP
076/26
16APR26/16APR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 16 April 2027 (estimated), four wind turbines will be under construction at La Estrella Wind Farm in the municipality of Mosqueruela (Teruel).
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P23-0053-LE4-04 | 402448.64N 0002054.14W | 1744 | 200 |
P23-0053-LE4-05 | 402409.93N 0001935.70W | 1743 | 200 |
P23-0053-LE4-06 | 402355.94N 0001946.35W | 1727 | 200 |
P23-0053-LE4-07 | 402347.60N 0002006.82W | 1680 | 200 |