SUP
077/26
16APR26/16APR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
077/26
16-APR-26
EFFECTIVE DATE WEF
ENR
CANCEL: SUP 62/25
SUP
077/26
16APR26/16APR27EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 16 April 2027 (estimated), eight wind turbines and a measurement tower will be under construction at Cid I Wind Farm, in the municipality of Cantavieja (Teruel).
For their construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
|---|---|---|---|
CI1-01 | 403218.76N 0001847.76W | 1476 | 200 |
CI1-02 | 403207.66N 0001902.91W | 1472 | 200 |
CI1-03 | 403212.94N 0001931.64W | 1491 | 200 |
CI1-04 | 403159.80N 0001944.36W | 1501 | 200 |
CI1-05 | 403148.30N 0001958.63W | 1509 | 200 |
CI1-06 | 403133.87N 0002010.00W | 1522 | 200 |
CI1-TM | 403224.19N 0001859.74W | 1399 | 120 |
Mobile crane | - | - | 140 |