Until 03 September 2027 (estimated), one meteorological tower will be under installation El Castillar Wind Farm in the municipality of Algora (Guadalajara).
For its construction, the installation of one mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT (M) |
P25-0278 TM | 405449.63N 0023915.51W | 1231 | 125 |
Mobile crane | - | - | 130 |