SUP
182/24
28NOV24/28NOV25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
ENAIRE
DIVISIÓN DE INFORMACIÓN AERONÁUTICA
c/ Campezo, 1. EDIFICIO 2
Kudos Innovation Campus Las Mercedes
28022 Madrid (ESPAÑA)
AIP-ESPAÑA
SUP
182/24
AIRAC
17-OCT-24
EFFECTIVE DATE WEF
28-NOV-24
ENR
SUP
182/24
28NOV24/28NOV25EST
NOTE: EST SUP will only be cancelled by NOTAM, SUP or AIP amendment.
Until 28 November 2025 (estimated), eleven wind turbines will be under construction at “Mondigo” Wind Farm in the municipalities of Ribadeo and Trabada (Lugo).
For its construction, the installation of a mobile crane will be necessary.
The projected height, elevation and location of each element are detailed in the table below:
ID | COORD | ELEV (M AMSL) | HGT(M) |
A-01 | 434561.36N 0071379.33W | 569 | 150 |
A-02 | 434612.30N0071372.45W | 619 | 150 |
A-03 | 434648.85N 0071366.38W | 632 | 150 |
A-04 | 434658.23N 0071417.15W | 575 | 150 |
A-06 | 434750.59N 0071404.67W | 563 | 150 |
A-07 | 434771.16N 0071501.72W | 578 | 150 |
A-08 | 434831.31N 0071518.56W | 538 | 150 |
A-09 | 434581.38N 0071811.45W | 568 | 150 |
A-10 | 434582.84N 0071863.94W | 623 | 150 |
A-11 | 434603.96N 0071895.70W | 633 | 150 |
A-12 | 434631.37N 0071914.90W | 630 | 150 |
Mobile crane | - | - | 120 |