AIP

ESPAÑA

AD 2 - GCRR IAC 10IAC 9

WEF 03-SEP-26WEF 11-JUN-26

CHANGES:

MOCA, AD ELEVATION, CONTROLLING OBSTACLES, RENUMBERING, NO CIRCLING.

AERONAUTICAL DATABASE REQUIREMENTS

INSTRUMENT APPROACH PROCEDURES

VOR B

POINT

LAT

LONG

TRUE BEARING

DISTANCE DME (NM)

DVOR/DME LTE (IAF)

285653.45N

0133604.8W

–

–

TUXAM (IF)

290750.8N

0132909.7W

029.00º (LTE)

12.50 DME LTE

FAF

290322.6N

0133159.3W

029.00º (LTE)

7.40 DME LTE

MAPT

285812.3N

0133515.21W

029.00º (LTE)

1.50 DME LTE

Non-precision final approach - Slope (Descent angle)

–

CRITICAL DME

FACILITY (ID)

FREQ/CH

COORD

LZR DME

115.2 / 99X

290956.4346 N 0133039.5646 W

NOTES APPLICABLE TO ALL APPROACHES:

  • Speed control:

  1. Unless otherwise instructed by ATC, cross:

    • IAS 200 kt over IF TUXAM;

    • IAS 170 kt at 9.4 DME LTE;

    • IAS 160 kt at 4.4 DME LTE.

  2. If unable to comply, advise ATC on first contact.